Observation on MEP design submission by BUCG
This record consists of general correspondence regarding observation on MEP design submission by BUCG of BRAC University new campus project.
Príomhchruthaitheoir: | Brac University |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/19692 |
Míreanna comhchosúla
-
Submission of proposal by BUCG for the management fee for the MEP packages work co-ordination
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Instruction to appoint experienced architect and MEP engineer to supervise the finishing works and MEP works
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
The status of MEP IFC drawing
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
VO#32 Valuation of embedded parts and junction box for MEP works
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Submitting the present status about MEP and related works as per scope of services, BRACU new campus project
de réir: Brac University
Foilsithe / Cruthaithe: (2023)