Re-submission of construction schedule for the next three month (July-September 2019) based on actual work progress
This record consists of general correspondence regarding the re-submission of construction schedule for the next three month (July-September 2019) based on actual work progress of BRACU new campus project site.
Príomhchruthaitheoir: | Brac University |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/19681 |
Míreanna comhchosúla
-
Submission of work progress report and three month schedule of BRAC University new campus project
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Submission of monthly progress report
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Submission of three month schedule
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Submission of three months’ work schedule
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Submission of monthly progress report (MPR)
de réir: Brac University
Foilsithe / Cruthaithe: (2023)