Submission of detail quantity of pre-engineering steel section
This record consists of general correspondence regarding the submission of detail quantity of pre-engineering steel section under BoQ ltem No. 5.2.3,5.2.4,5.2.51 5.2.6 to 5.2.7 for the Construction Work of Brac University New Campus Project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19671 |
مواد مشابهة
-
Regarding inspection of pre-engineering steel sections
بواسطة: Brac University
منشور في: (2023) -
Instruction to submit supply schedule for pre-engineering steel section
بواسطة: Brac University
منشور في: (2023) -
L/C for pre-engineering steel sections
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Regarding inspection before shipment of pre-engineering steel works and components
بواسطة: Brac University
منشور في: (2023) -
Adjustment of LC amount with billed amount against supplied pre-fabricated steel structure
بواسطة: Brac University
منشور في: (2023)