Instruction to keep provision for Davit Arm
This record consists of general correspondence regarding instruction to keep provision for Davit Arm for BRAC University new campus project.
Auteur principal: | Brac University |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/19657 |
Documents similaires
-
Request for specifying the location of Davit arm at roof floor of BRAC University new campus project
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Davit arm layout drawing of BRAC University New Campus Project for RAJUK
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2024) -
Architectural and structural drawing for davit arm including TDS & weight (RFA-001_Rev.C)
par: Fabcons Construction & Fabrication
Publié: (2023) -
Contractor shop drawing of davit arm roof plan for BRACU (RFA-001_Rev.A,C & E)
par: Fabcons Construction & Fabrication
Publié: (2023) -
Request for review of materials for supply installation, testing & commissioning of davit arm for BRACU (RFA-002_Rev.0)
par: Fabcons Construction & Fabrication
Publié: (2023)