Missing of punches for MEP works in the concrete members (slab, beam & walls)
This record consists of general correspondence regarding the missing punches for MEP works and order to postpone the concreting program for selected areas of BRACU new campus project.
第一著者: | Brac University |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/19644 |
類似資料
-
Purchase order for punch through concrete slab for the condensate drain pipe for each HAHU of the classroom for BracU new campus project
著者:: Brac University
出版事項: (2023) -
Instruction to appoint experienced architect and MEP engineer to supervise the finishing works and MEP works
著者:: Brac University
出版事項: (2023) -
Wall & floor punch location & dimension layout for basement plan
著者:: Electro-Mechanical Control Services (EMCS)
出版事項: (2023) -
Delayed submitting of check list for concreting work
著者:: Brac University
出版事項: (2023) -
VO#32 Valuation of embedded parts and junction box for MEP works