Observation on the mock-up of some of the finishing work done on 7F
This record consists of general correspondence regarding inspection on the mock-up of some of the finishing work done on 7F of BRACU new campus project.
主要作者: | Brac University |
---|---|
格式: | General correspondence |
语言: | English |
出版: |
Brac University
2023
|
主题: | |
在线阅读: | http://hdl.handle.net/10361/19642 |
相似书籍
-
Plumbing work for the planter boxes on the roof and in different floors within the building
由: Brac University
出版: (2023) -
Plumbing work for the planter boxes on the roof and in different floors within the building
由: Brac University
出版: (2023) -
Plumbing work for the planter boxes on the roof and in different floors within the building of BRAC University new campus project
由: Brac University
出版: (2023) -
VO#054 Quotation for additional pipe works in deep tube well and planter boxes rev.00
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
12F floor tiles layout and finishes ( RFA-445_Rev D)
由: WOHA Designs PTE LTD, et al.
出版: (2023)