Observation on the mock-up of some of the finishing work done on 7F
This record consists of general correspondence regarding inspection on the mock-up of some of the finishing work done on 7F of BRACU new campus project.
Autor principal: | Brac University |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/19642 |
Registos relacionados
-
Plumbing work for the planter boxes on the roof and in different floors within the building
Por: Brac University
Publicado em: (2023) -
Plumbing work for the planter boxes on the roof and in different floors within the building
Por: Brac University
Publicado em: (2023) -
Plumbing work for the planter boxes on the roof and in different floors within the building of BRAC University new campus project
Por: Brac University
Publicado em: (2023) -
VO#054 Quotation for additional pipe works in deep tube well and planter boxes rev.00
Por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
12F floor tiles layout and finishes ( RFA-445_Rev D)
Por: WOHA Designs PTE LTD, et al.
Publicado em: (2023)