Observation on the mock-up of some of the finishing work done on 7F
This record consists of general correspondence regarding inspection on the mock-up of some of the finishing work done on 7F of BRACU new campus project.
Main Author: | Brac University |
---|---|
Format: | General correspondence |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/19642 |
Similar Items
-
Plumbing work for the planter boxes on the roof and in different floors within the building
by: Brac University
Published: (2023) -
Plumbing work for the planter boxes on the roof and in different floors within the building
by: Brac University
Published: (2023) -
Plumbing work for the planter boxes on the roof and in different floors within the building of BRAC University new campus project
by: Brac University
Published: (2023) -
VO#054 Quotation for additional pipe works in deep tube well and planter boxes rev.00
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
12F floor tiles layout and finishes ( RFA-445_Rev D)
by: WOHA Designs PTE LTD, et al.
Published: (2023)