Observation on the mock-up of some of the finishing work done on 7F
This record consists of general correspondence regarding inspection on the mock-up of some of the finishing work done on 7F of BRACU new campus project.
প্রধান লেখক: | Brac University |
---|---|
বিন্যাস: | General correspondence |
ভাষা: | English |
প্রকাশিত: |
Brac University
2023
|
বিষয়গুলি: | |
অনলাইন ব্যবহার করুন: | http://hdl.handle.net/10361/19642 |
অনুরূপ উপাদানগুলি
-
Plumbing work for the planter boxes on the roof and in different floors within the building
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Plumbing work for the planter boxes on the roof and in different floors within the building
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Plumbing work for the planter boxes on the roof and in different floors within the building of BRAC University new campus project
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
VO#054 Quotation for additional pipe works in deep tube well and planter boxes rev.00
অনুযায়ী: BUCG-ABC Joint Venture (BUCG-ABC JV)
প্রকাশিত: (2023) -
12F floor tiles layout and finishes ( RFA-445_Rev D)
অনুযায়ী: WOHA Designs PTE LTD, অন্যান্য