Observation on the mock-up of some of the finishing work done on 7F
This record consists of general correspondence regarding inspection on the mock-up of some of the finishing work done on 7F of BRACU new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19642 |
مواد مشابهة
-
Plumbing work for the planter boxes on the roof and in different floors within the building
بواسطة: Brac University
منشور في: (2023) -
Plumbing work for the planter boxes on the roof and in different floors within the building
بواسطة: Brac University
منشور في: (2023) -
Plumbing work for the planter boxes on the roof and in different floors within the building of BRAC University new campus project
بواسطة: Brac University
منشور في: (2023) -
VO#054 Quotation for additional pipe works in deep tube well and planter boxes rev.00
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
12F floor tiles layout and finishes ( RFA-445_Rev D)
بواسطة: WOHA Designs PTE LTD, وآخرون
منشور في: (2023)