Re-organizing the present site management team of the Contractor BUCG-ABC JV in the BRAC University new campus project
This record consists of general correspondence regarding re-organizing the present site management team of the Contractor BUCG-ABC JV in the BRAC University new campus project.
Yazar: | Brac University |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/19633 |
Benzer Materyaller
-
The engineer's instruction to submit organogram of BUCG-ABC JV
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
The engineer's instruction to submit organogram at BUCG-ABC JV
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
BUCG-ABC JV cashflow calculation
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Regarding physical assault of a worker of NS Construction by the worker of BUCG-ABC JV in the project site
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Invoice of utility bill reimbursement from BUCG-ABC JV
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023)