Re-organizing the present site management team of the Contractor BUCG-ABC JV in the BRAC University new campus project
This record consists of general correspondence regarding re-organizing the present site management team of the Contractor BUCG-ABC JV in the BRAC University new campus project.
Príomhchruthaitheoir: | Brac University |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/19633 |
Míreanna comhchosúla
-
The engineer's instruction to submit organogram of BUCG-ABC JV
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
The engineer's instruction to submit organogram at BUCG-ABC JV
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
BUCG-ABC JV cashflow calculation
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Regarding physical assault of a worker of NS Construction by the worker of BUCG-ABC JV in the project site
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Invoice of utility bill reimbursement from BUCG-ABC JV
de réir: Brac University
Foilsithe / Cruthaithe: (2023)