Punches in the walls and slabs are being kept as per submitted drawing

This record consists of general correspondence regarding the punches of walls and slabs with work scope of supply, installation, testing and commissioning of substation, HT panel, LT panel and BBT system for BRACU new campus project.

Bibliografske podrobnosti
Glavni avtor: Brac University
Format: General correspondence
Jezik:English
Izdano: Brac University 2023
Teme:
Online dostop:http://hdl.handle.net/10361/19631