Punches in the walls and slabs are being kept as per submitted drawing
This record consists of general correspondence regarding the punches of walls and slabs with work scope of supply, installation, testing and commissioning of substation, HT panel, LT panel and BBT system for BRACU new campus project.
Autore principale: | |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/19631 |