Punches in the walls and slabs are being kept as per submitted drawing
This record consists of general correspondence regarding the punches of walls and slabs including work scope of supply, testing and commissioning of HVAC system for BRACU new campus project.
主要作者: | Brac University |
---|---|
格式: | General correspondence |
语言: | English |
出版: |
Brac University
2023
|
主题: | |
在线阅读: | http://hdl.handle.net/10361/19628 |
相似书籍
Punches in the walls and slabs are being kept as per submitted drawing
由: Brac University
出版: (2023)
由: Brac University
出版: (2023)
Punches in the walls and slabs are being kept as per submitted drawing
由: Brac University
出版: (2023)
由: Brac University
出版: (2023)
相似书籍
-
Punches in the walls and slabs are being kept as per submitted drawing
由: Brac University
出版: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
由: Brac University
出版: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
由: Brac University
出版: (2023) -
Submitting revised detailed work program
由: Brac University
出版: (2023) -
Beam slab wall column of ground floor of BRAC University New Campus Project for RAJUK
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2024)