Punches in the walls and slabs are being kept as per submitted drawing
This record consists of general correspondence regarding the punches of walls and slabs including work scope of supply, testing and commissioning of HVAC system for BRACU new campus project.
Yazar: | Brac University |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/19628 |
Benzer Materyaller
-
Punches in the walls and slabs are being kept as per submitted drawing
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Submitting revised detailed work program
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Beam slab wall column of ground floor of BRAC University New Campus Project for RAJUK
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2024)