Punches in the walls and slabs are being kept as per submitted drawing
This record consists of general correspondence regarding the punches of walls and slabs including work scope of supply, testing and commissioning of HVAC system for BRACU new campus project.
Autor Principal: | Brac University |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado: |
Brac University
2023
|
Subjects: | |
Acceso en liña: | http://hdl.handle.net/10361/19628 |
Títulos similares
-
Punches in the walls and slabs are being kept as per submitted drawing
por: Brac University
Publicado: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
por: Brac University
Publicado: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
por: Brac University
Publicado: (2023) -
Submitting revised detailed work program
por: Brac University
Publicado: (2023) -
Beam slab wall column of ground floor of BRAC University New Campus Project for RAJUK
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2024)