Punches in the walls and slabs are being kept as per submitted drawing
This record consists of general correspondence regarding the punches of walls and slabs including work scope of supply, testing and commissioning of HVAC system for BRACU new campus project.
Main Author: | Brac University |
---|---|
Format: | General correspondence |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/19628 |
Similar Items
-
Punches in the walls and slabs are being kept as per submitted drawing
by: Brac University
Published: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
by: Brac University
Published: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
by: Brac University
Published: (2023) -
Submitting revised detailed work program
by: Brac University
Published: (2023) -
Beam slab wall column of ground floor of BRAC University New Campus Project for RAJUK
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2024)