Punches in the walls and slabs are being kept as per submitted drawing
This record consists of general correspondence regarding the punches of walls and slabs including work scope of supply, testing and commissioning of HVAC system for BRACU new campus project.
1. Verfasser: | Brac University |
---|---|
Format: | General correspondence |
Sprache: | English |
Veröffentlicht: |
Brac University
2023
|
Schlagworte: | |
Online Zugang: | http://hdl.handle.net/10361/19628 |
Ähnliche Einträge
-
Punches in the walls and slabs are being kept as per submitted drawing
von: Brac University
Veröffentlicht: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
von: Brac University
Veröffentlicht: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
von: Brac University
Veröffentlicht: (2023) -
Submitting revised detailed work program
von: Brac University
Veröffentlicht: (2023) -
Beam slab wall column of ground floor of BRAC University New Campus Project for RAJUK
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2024)