Punches in the walls and slabs are being kept as per submitted drawing
This record consists of general correspondence regarding the punches of walls and slabs including work scope of supply, testing and commissioning of HVAC system for BRACU new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19628 |
مواد مشابهة
-
Punches in the walls and slabs are being kept as per submitted drawing
بواسطة: Brac University
منشور في: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
بواسطة: Brac University
منشور في: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
بواسطة: Brac University
منشور في: (2023) -
Submitting revised detailed work program
بواسطة: Brac University
منشور في: (2023) -
Beam slab wall column of ground floor of BRAC University New Campus Project for RAJUK