Punches in the walls and slabs are being kept as per submitted drawing
This record consists of general correspondence regarding the punches of walls and slabs including work scope of supply, testing and commissioning of HVAC system for BRACU new campus project.
| Prif Awdur: | Brac University |
|---|---|
| Fformat: | General correspondence |
| Iaith: | English |
| Cyhoeddwyd: |
Brac University
2023
|
| Pynciau: | |
| Mynediad Ar-lein: | http://hdl.handle.net/10361/19628 |
Eitemau Tebyg
-
Punches in the walls and slabs are being kept as per submitted drawing
gan: Brac University
Cyhoeddwyd: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
gan: Brac University
Cyhoeddwyd: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
gan: Brac University
Cyhoeddwyd: (2023) -
Submitting revised detailed work program
gan: Brac University
Cyhoeddwyd: (2023) -
Beam slab wall column of ground floor of BRAC University New Campus Project for RAJUK
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2024)