Punches in the walls and slabs are being kept as per submitted drawing
This record consists of general correspondence regarding punches in the walls and slabs with the work scope of supply, installation and commissioning of lift & escalator of BRACU new campus project.
Yazar: | Brac University |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/19620 |
Benzer Materyaller
-
Punches in the walls and slabs are being kept as per submitted drawing
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Completing modification in beams, slabs for escalator installation
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Supply of lift and escalator
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023)