Punches in the walls and slabs are being kept as per submitted drawing
This record consists of general correspondence regarding punches in the walls and slabs with the work scope of supply, installation and commissioning of lift & escalator of BRACU new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19620 |
مواد مشابهة
-
Punches in the walls and slabs are being kept as per submitted drawing
بواسطة: Brac University
منشور في: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
بواسطة: Brac University
منشور في: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
بواسطة: Brac University
منشور في: (2023) -
Completing modification in beams, slabs for escalator installation
بواسطة: Brac University
منشور في: (2023) -
Supply of lift and escalator
بواسطة: Brac University
منشور في: (2023)