Punches in the walls and slabs are being kept as per submitted drawing
This record consists of general correspondence regarding punches in the walls and slabs with the work scope of supply, installation and commissioning of lift & escalator of BRACU new campus project.
Tác giả chính: | Brac University |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/19620 |
Những quyển sách tương tự
-
Punches in the walls and slabs are being kept as per submitted drawing
Bằng: Brac University
Được phát hành: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
Bằng: Brac University
Được phát hành: (2023) -
Punches in the walls and slabs are being kept as per submitted drawing
Bằng: Brac University
Được phát hành: (2023) -
Completing modification in beams, slabs for escalator installation
Bằng: Brac University
Được phát hành: (2023) -
Supply of lift and escalator
Bằng: Brac University
Được phát hành: (2023)