Regarding selection of RMC plant
This record consists of general correspondence regarding the selection of RMC plant of BRACU new campus project site.
Päätekijä: | Brac University |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | Spanish / Castilian |
Julkaistu: |
Brac University
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/19609 |
Samankaltaisia teoksia
-
Regarding inferior quality of materials visually found at RMC plant
Tekijä: Brac University
Julkaistu: (2023) -
Regarding emergency RMC supply for BRACU new campus project
Tekijä: Brac University
Julkaistu: (2023) -
The engineer's observations and suggestions on RMC plant
Tekijä: Brac University
Julkaistu: (2023) -
The engineer's observation on changed RMC plant
Tekijä: Brac University
Julkaistu: (2023) -
Designated RMC plants of BRAC University new campus project
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023)