Instruction to start the work at BRACU new campus project (Substation)
This record consists of general correspondence regarding the instruction to start the work of supply, installation, testing and commissioning of substation of BRACU new campus project.
Príomhchruthaitheoir: | Brac University |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/19600 |
Míreanna comhchosúla
-
Instruction to start the work of substation at BRACU new campus project
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Regarding the temporary substation (internal substation) of the project
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Minutes of introductory meeting on supply of substation of BRACU new campus project
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Request for final due payment for temporary substation work of BRAC University new campus project
de réir: B-Trac Engineering Ltd.
Foilsithe / Cruthaithe: (2023)