Instruction to start the work at BRACU new campus project (Substation)
This record consists of general correspondence regarding the instruction to start the work of supply, installation, testing and commissioning of substation of BRACU new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19600 |
مواد مشابهة
-
Instruction to start the work of substation at BRACU new campus project
بواسطة: Brac University
منشور في: (2023) -
Regarding the temporary substation (internal substation) of the project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Minutes of introductory meeting on supply of substation of BRACU new campus project
بواسطة: Brac University
منشور في: (2023) -
Request for final due payment for temporary substation work of BRAC University new campus project
بواسطة: B-Trac Engineering Ltd.
منشور في: (2023)