Taking spot levels and preparing pre-work of the tiling areas
This record consists of general correspondence regarding the pre-work of the tiling areas of BRACU new campus project.
Yazar: | Brac University |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/19598 |
Benzer Materyaller
-
Instruction to complete the tiling work in the floors 6 to 12 and the toilets
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Methodology of tiling work of BRAC University new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Rejected tiles-type TL-1 - TL-2, supplying of 2nd consignment of tiles TL-1 and TL-2 and supplying 1st lot of tile type TL-6
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Damaging and breaking the employer supplied tiles during handling/shifting and placing/fixing tiles
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Damaging and breaking the employer supplied tiles during handling/shifting and placing/fixing tiles
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023)