Taking spot levels and preparing pre-work of the tiling areas
This record consists of general correspondence regarding the pre-work of the tiling areas of BRACU new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19598 |
مواد مشابهة
-
Instruction to complete the tiling work in the floors 6 to 12 and the toilets
بواسطة: Brac University
منشور في: (2023) -
Methodology of tiling work of BRAC University new campus project
بواسطة: Brac University
منشور في: (2023) -
Rejected tiles-type TL-1 - TL-2, supplying of 2nd consignment of tiles TL-1 and TL-2 and supplying 1st lot of tile type TL-6
بواسطة: Brac University
منشور في: (2023) -
Damaging and breaking the employer supplied tiles during handling/shifting and placing/fixing tiles
بواسطة: Brac University
منشور في: (2023) -
Damaging and breaking the employer supplied tiles during handling/shifting and placing/fixing tiles
بواسطة: Brac University
منشور في: (2023)