The engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project

This record consists of general correspondence regarding the engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project.

Opis bibliograficzny
1. autor: Brac University
Format: General correspondence
Język:English
Wydane: Brac University 2023
Hasła przedmiotowe:
Dostęp online:http://hdl.handle.net/10361/19595