The engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project
This record consists of general correspondence regarding the engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project.
Huvudupphovsman: | Brac University |
---|---|
Materialtyp: | General correspondence |
Språk: | English |
Publicerad: |
Brac University
2023
|
Ämnen: | |
Länkar: | http://hdl.handle.net/10361/19595 |
Liknande verk
-
Request to release balance amount under BOQ 3.6
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
av: Brac University
Publicerad: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
av: Brac University
Publicerad: (2023) -
Initial observation on the BMS system design drawings and BOQ
av: Brac University
Publicerad: (2023) -
Observation on the electrical design drawings and BoQ
av: Brac University
Publicerad: (2023)