The engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project
This record consists of general correspondence regarding the engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project.
第一著者: | Brac University |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/19595 |
類似資料
-
Request to release balance amount under BOQ 3.6
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
著者:: Brac University
出版事項: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
著者:: Brac University
出版事項: (2023) -
Initial observation on the BMS system design drawings and BOQ
著者:: Brac University
出版事項: (2023) -
Observation on the electrical design drawings and BoQ
著者:: Brac University
出版事項: (2023)