The engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project
This record consists of general correspondence regarding the engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project.
Autore principale: | Brac University |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/19595 |
Documenti analoghi
-
Request to release balance amount under BOQ 3.6
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
di: Brac University
Pubblicazione: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
di: Brac University
Pubblicazione: (2023) -
Initial observation on the BMS system design drawings and BOQ
di: Brac University
Pubblicazione: (2023) -
Observation on the electrical design drawings and BoQ
di: Brac University
Pubblicazione: (2023)