The engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project
This record consists of general correspondence regarding the engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project.
मुख्य लेखक: | Brac University |
---|---|
स्वरूप: | General correspondence |
भाषा: | English |
प्रकाशित: |
Brac University
2023
|
विषय: | |
ऑनलाइन पहुंच: | http://hdl.handle.net/10361/19595 |
समान संसाधन
-
Request to release balance amount under BOQ 3.6
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
द्वारा: Brac University
प्रकाशित: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
द्वारा: Brac University
प्रकाशित: (2023) -
Initial observation on the BMS system design drawings and BOQ
द्वारा: Brac University
प्रकाशित: (2023) -
Observation on the electrical design drawings and BoQ
द्वारा: Brac University
प्रकाशित: (2023)