The engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project
This record consists of general correspondence regarding the engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project.
1. Verfasser: | Brac University |
---|---|
Format: | General correspondence |
Sprache: | English |
Veröffentlicht: |
Brac University
2023
|
Schlagworte: | |
Online Zugang: | http://hdl.handle.net/10361/19595 |
Ähnliche Einträge
-
Request to release balance amount under BOQ 3.6
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
von: Brac University
Veröffentlicht: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
von: Brac University
Veröffentlicht: (2023) -
Initial observation on the BMS system design drawings and BOQ
von: Brac University
Veröffentlicht: (2023) -
Observation on the electrical design drawings and BoQ
von: Brac University
Veröffentlicht: (2023)