The engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project
This record consists of general correspondence regarding the engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project.
Hovedforfatter: | Brac University |
---|---|
Format: | General correspondence |
Sprog: | English |
Udgivet: |
Brac University
2023
|
Fag: | |
Online adgang: | http://hdl.handle.net/10361/19595 |
Lignende værker
-
Request to release balance amount under BOQ 3.6
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
af: Brac University
Udgivet: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
af: Brac University
Udgivet: (2023) -
Initial observation on the BMS system design drawings and BOQ
af: Brac University
Udgivet: (2023) -
Observation on the electrical design drawings and BoQ
af: Brac University
Udgivet: (2023)