Construction production be adversely affected by modification of original design
This record consists of general correspondence regarding the construction production be adversely affected by modification of original design of BRAC University new campus project.
Príomhchruthaitheoir: | Brac University |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/19584 |
Míreanna comhchosúla
-
Construction production be adversely affected by modification of original design of BRAC University new campus project
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Clarification for the master construction schedule
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Certificate for the construction materials of BRAC University new campus project
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Price escalation of unit rate for construction works of brick wall and boundary wall of NS Construction due to unusual increase of construction material price
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Pending Issue of design coordination for 1F-3F construction
de réir: Brac University
Foilsithe / Cruthaithe: (2023)