Construction production be adversely affected by modification of original design
This record consists of general correspondence regarding the construction production be adversely affected by modification of original design of BRAC University new campus project.
Prif Awdur: | Brac University |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/19584 |
Eitemau Tebyg
-
Construction production be adversely affected by modification of original design of BRAC University new campus project
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Clarification for the master construction schedule
gan: Brac University
Cyhoeddwyd: (2023) -
Certificate for the construction materials of BRAC University new campus project
gan: Brac University
Cyhoeddwyd: (2023) -
Price escalation of unit rate for construction works of brick wall and boundary wall of NS Construction due to unusual increase of construction material price
gan: Brac University
Cyhoeddwyd: (2023) -
Pending Issue of design coordination for 1F-3F construction
gan: Brac University
Cyhoeddwyd: (2023)