Construction production be adversely affected by modification of original design
This record consists of general correspondence regarding the construction production be adversely affected by modification of original design of BRAC University new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19584 |
مواد مشابهة
-
Construction production be adversely affected by modification of original design of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Clarification for the master construction schedule
بواسطة: Brac University
منشور في: (2023) -
Certificate for the construction materials of BRAC University new campus project
بواسطة: Brac University
منشور في: (2023) -
Price escalation of unit rate for construction works of brick wall and boundary wall of NS Construction due to unusual increase of construction material price
بواسطة: Brac University
منشور في: (2023) -
Pending Issue of design coordination for 1F-3F construction
بواسطة: Brac University
منشور في: (2023)