Observation on CC3 for steel column cladding concrete
This record consists of general correspondence regarding observation on CC3 for steel column cladding concrete of BRAC University new campus project.
Tác giả chính: | Brac University |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/19583 |
Những quyển sách tương tự
-
Work order for supply, installation and commissioning of stainless steel sheet cladding on the wall around lift opening for the BRACU new campus project at holding no. Kha 224,Merul Badda,Dhaka-1212.
Bằng: Brac University
Được phát hành: (2023) -
The engineer’s Instruction to stake the connecting vertical plate of pre-engineering steel column
Bằng: Brac University
Được phát hành: (2023) -
Regarding pouring of concrete in the steel tube column of BRAC University new campus project
Bằng: Brac University
Được phát hành: (2023) -
V0#025 Proposal of steel Y-column core filling with chemical around 4th storey
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Prepare mock-up for different type of brick wall and circular column
Bằng: Brac University
Được phát hành: (2023)