Observation on CC3 for steel column cladding concrete
This record consists of general correspondence regarding observation on CC3 for steel column cladding concrete of BRAC University new campus project.
Yazar: | Brac University |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/19583 |
Benzer Materyaller
-
Work order for supply, installation and commissioning of stainless steel sheet cladding on the wall around lift opening for the BRACU new campus project at holding no. Kha 224,Merul Badda,Dhaka-1212.
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
The engineer’s Instruction to stake the connecting vertical plate of pre-engineering steel column
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Regarding pouring of concrete in the steel tube column of BRAC University new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
V0#025 Proposal of steel Y-column core filling with chemical around 4th storey
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Prepare mock-up for different type of brick wall and circular column
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023)