Observation on CC3 for steel column cladding concrete
This record consists of general correspondence regarding observation on CC3 for steel column cladding concrete of BRAC University new campus project.
Главный автор: | Brac University |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/19583 |
Схожие документы
-
Work order for supply, installation and commissioning of stainless steel sheet cladding on the wall around lift opening for the BRACU new campus project at holding no. Kha 224,Merul Badda,Dhaka-1212.
по: Brac University
Опубликовано: (2023) -
The engineer’s Instruction to stake the connecting vertical plate of pre-engineering steel column
по: Brac University
Опубликовано: (2023) -
Regarding pouring of concrete in the steel tube column of BRAC University new campus project
по: Brac University
Опубликовано: (2023) -
V0#025 Proposal of steel Y-column core filling with chemical around 4th storey
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Prepare mock-up for different type of brick wall and circular column
по: Brac University
Опубликовано: (2023)