Observation on CC3 for steel column cladding concrete
This record consists of general correspondence regarding observation on CC3 for steel column cladding concrete of BRAC University new campus project.
1. autor: | Brac University |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/19583 |
Podobne zapisy
-
Work order for supply, installation and commissioning of stainless steel sheet cladding on the wall around lift opening for the BRACU new campus project at holding no. Kha 224,Merul Badda,Dhaka-1212.
od: Brac University
Wydane: (2023) -
The engineer’s Instruction to stake the connecting vertical plate of pre-engineering steel column
od: Brac University
Wydane: (2023) -
Regarding pouring of concrete in the steel tube column of BRAC University new campus project
od: Brac University
Wydane: (2023) -
V0#025 Proposal of steel Y-column core filling with chemical around 4th storey
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Prepare mock-up for different type of brick wall and circular column
od: Brac University
Wydane: (2023)