Observation on CC3 for steel column cladding concrete
This record consists of general correspondence regarding observation on CC3 for steel column cladding concrete of BRAC University new campus project.
第一著者: | Brac University |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/19583 |
類似資料
-
Work order for supply, installation and commissioning of stainless steel sheet cladding on the wall around lift opening for the BRACU new campus project at holding no. Kha 224,Merul Badda,Dhaka-1212.
著者:: Brac University
出版事項: (2023) -
The engineer’s Instruction to stake the connecting vertical plate of pre-engineering steel column
著者:: Brac University
出版事項: (2023) -
Regarding pouring of concrete in the steel tube column of BRAC University new campus project
著者:: Brac University
出版事項: (2023) -
V0#025 Proposal of steel Y-column core filling with chemical around 4th storey
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Prepare mock-up for different type of brick wall and circular column
著者:: Brac University
出版事項: (2023)