Clarification for the master construction schedule

This record consists of general correspondence regarding the clarification for the master construction schedule of BRAC University new campus project.

Bibliografiska uppgifter
Huvudupphovsman: Brac University
Materialtyp: General correspondence
Språk:English
Publicerad: Brac University 2023
Ämnen:
Länkar:http://hdl.handle.net/10361/19577
id 10361-19577
record_format dspace
spelling 10361-195772023-08-22T21:02:20Z Clarification for the master construction schedule Brac University New campus project General correspondence Maaster construction schedule This record consists of general correspondence regarding the clarification for the master construction schedule of BRAC University new campus project. 2023-08-22T09:19:46Z 2023-08-22T09:19:46Z ©2019 2019-04-27 General correspondence No. BRACU-NCP/2019/28A http://hdl.handle.net/10361/19577 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 1 page application/pdf Brac University
institution Brac University
collection Institutional Repository
language English
topic New campus project
General correspondence
Maaster construction schedule
spellingShingle New campus project
General correspondence
Maaster construction schedule
Brac University
Clarification for the master construction schedule
description This record consists of general correspondence regarding the clarification for the master construction schedule of BRAC University new campus project.
format General correspondence
author Brac University
author_facet Brac University
author_sort Brac University
title Clarification for the master construction schedule
title_short Clarification for the master construction schedule
title_full Clarification for the master construction schedule
title_fullStr Clarification for the master construction schedule
title_full_unstemmed Clarification for the master construction schedule
title_sort clarification for the master construction schedule
publisher Brac University
publishDate 2023
url http://hdl.handle.net/10361/19577
work_keys_str_mv AT bracuniversity clarificationforthemasterconstructionschedule
_version_ 1814307007261310976