Approval of unit rates of non-schedule item 'Rebar Welding with Existing Rebar of D-Wall for Constructing Permanent Capping Beam'
This record consists of general correspondence regarding approval of unit rates of non-schedule item 'Rebar Welding with Existing Rebar of D-Wall for Constructing Permanent Capping Beam' of BRAC University new campus project.
Автор: | Brac University |
---|---|
Формат: | General correspondence |
Мова: | English |
Опубліковано: |
Brac University
2023
|
Предмети: | |
Онлайн доступ: | http://hdl.handle.net/10361/19568 |
Схожі ресурси
-
Rebar welding at permanent caping in D-wall
за авторством: Brac University
Опубліковано: (2023) -
Rebar welding at permanent caping in D-wall
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023) -
VO.20 - Approval of unit rates of non-schedule item rebar welding works connected to plate of steel column
за авторством: Brac University
Опубліковано: (2023) -
VO#20 Approval of unit rates for rebar welding works connected to plate of steel column
за авторством: Brac University
Опубліковано: (2023) -
Adding rebar dia 32mm welding works to vol. #20
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023)