Approval of unit rates of non-schedule item 'Rebar Welding with Existing Rebar of D-Wall for Constructing Permanent Capping Beam'
This record consists of general correspondence regarding approval of unit rates of non-schedule item 'Rebar Welding with Existing Rebar of D-Wall for Constructing Permanent Capping Beam' of BRAC University new campus project.
Главный автор: | Brac University |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/19568 |
Схожие документы
-
Rebar welding at permanent caping in D-wall
по: Brac University
Опубликовано: (2023) -
Rebar welding at permanent caping in D-wall
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
VO.20 - Approval of unit rates of non-schedule item rebar welding works connected to plate of steel column
по: Brac University
Опубликовано: (2023) -
VO#20 Approval of unit rates for rebar welding works connected to plate of steel column
по: Brac University
Опубликовано: (2023) -
Adding rebar dia 32mm welding works to vol. #20
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023)