Approval of unit rates of non-schedule item 'Rebar Welding with Existing Rebar of D-Wall for Constructing Permanent Capping Beam'
This record consists of general correspondence regarding approval of unit rates of non-schedule item 'Rebar Welding with Existing Rebar of D-Wall for Constructing Permanent Capping Beam' of BRAC University new campus project.
Autor principal: | Brac University |
---|---|
Format: | General correspondence |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/19568 |
Ítems similars
-
Rebar welding at permanent caping in D-wall
per: Brac University
Publicat: (2023) -
Rebar welding at permanent caping in D-wall
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
VO.20 - Approval of unit rates of non-schedule item rebar welding works connected to plate of steel column
per: Brac University
Publicat: (2023) -
VO#20 Approval of unit rates for rebar welding works connected to plate of steel column
per: Brac University
Publicat: (2023) -
Adding rebar dia 32mm welding works to vol. #20
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023)