Submission of method statement for anti-termite treatment work over the plinth filling as per BOQ Item No. 4.4
This record consists of general correspondence regarding the submission of method statement for anti-termite treatment work over the plinth filling as per BOQ Item No. 4.4 of BRAC University new campus project.
第一著者: | Brac University |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/19567 |
類似資料
-
Variation order#44 Approval of non-schedule items' quantity and BoQ item for RCC bench & floor joints at stair
著者:: Brac University
出版事項: (2023) -
Regarding using of BRACU supplied cement/rebar for some works other than BOQ items
著者:: Brac University
出版事項: (2023) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5. and 5.2, 7.1.4, 7.2.6
著者:: Brac University
出版事項: (2023) -
Reply to the offer about fire protection coating at increased quantity of BOQ item no. 10.2
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Reply to the offer about fire protecting coating at increased amount of BOQ item no.10.2
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023)