Submitting the present status about MEP and related works as per scope of services, BRACU new campus project
This record consists of general correspondence regarding Submitting the present status about MEP and related works as per scope of services of BRAC University new campus project.
Päätekijä: | Brac University |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | English |
Julkaistu: |
Brac University
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/19544 |
Samankaltaisia teoksia
-
The status of MEP IFC drawing
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Instruction to appoint experienced architect and MEP engineer to supervise the finishing works and MEP works of BRAC University new campus project
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Instruction to appoint experienced architect and MEP engineer to supervise the finishing works and MEP works
Tekijä: Brac University
Julkaistu: (2023) -
Reminder for submitting the coordinated drawing on M & E design of BRACU new campus
Tekijä: Brac University
Julkaistu: (2023) -
Observation on MEP design submission by BUCG
Tekijä: Brac University
Julkaistu: (2023)